Back to Blog

ETL Developer Interview Questions 2026

Big DataHiringIT Hiring

Last updated: November 22, 2026

By Devin Hornick, Co-Founder, KORE1

The best ETL developer interview questions in 2026 hand the candidate a printed extract query, a load log, or a file header and ask what is silently wrong, because the worst pipeline failures still report success. Definitions and tool trivia earn ten minutes of the loop. They can’t carry it.

A job that fails is the easy case. It pages somebody, the dashboard goes red, and by nine a.m. a person who knows the system is already looking at it. The expensive jobs finish. Status green, row counts plausible, and 247 customers who should be gone still sitting in the warehouse a month later. Nobody gets paged for that.

Each of the five printed pages below describes a pipeline that succeeds and is wrong. An order the extract never sees. Deletes that never arrive. Two failed nights rerun into one. A vendor file that gained a column. And an hour that happened twice. I constructed every number so you can check the arithmetic at the table, and none of it comes from a client system. A candidate who has operated pipelines, as opposed to built them, usually finds the problem in a couple of minutes, and one who hasn’t tends to start rewriting the query.

Here’s the interest I have. KORE1 earns a fee when an ETL developer we introduced accepts an offer, and a loop that tests the wrong thing costs us as well, since a placement that leaves in six months is a search we run twice. Our ETL developer staffing desk recruits for these seats. Take the pages, run the hour yourself, and hire somebody we never met. The loop belongs to you.

Hiring manager and an ETL developer candidate talking across a bare oak table in a bright glass-walled meeting room

Where This Loop Fits, and Where the Neighbors Take Over

Scoping the search, pricing it, and running the process around the interviews is the job of our ETL developer hiring guide, and the pay sources are compared in the ETL developer salary guide. This page supplies the printed material for the technical rounds. Nothing else.

Four neighboring loops cover ground this one skips on purpose. Product depth for one vendor is in our Informatica developer interview questions. Python, pipeline design, and system design sit in the data engineer set, and dbt craft in the analytics engineer questions. Grain, slowly changing dimensions, and a MERGE that receives duplicate source rows are all in the data warehouse engineer exercises, so none of them repeats here. Those rounds exist somewhere. Assume them.

Ten Minutes of Fundamentals First

ETL stands for extract, transform, load. An ETL developer builds and runs the scheduled jobs that copy data out of source systems, reshape it, and load it into a warehouse or another system, and keeps those jobs correct when a source changes without warning.

Everyone prepares for the standard questions. Ten minutes, no more. What matters is the second column. It tells a panel that has never been paged at four a.m. what a real answer sounds like.

AskSomeone who has run these jobs saysSomeone who has read about them says
ETL or ELT, and when does it matter?Where the transform runs and who pays for the compute. Mask or shrink the data before it lands and you want ETL. Cheap, elastic warehouse and raw data you may need again, ELTTwo letters swapped, then a vendor name
Full load or incremental?Incremental needs a trustworthy change signal and a way to see deletes, and a periodic full compare catches what the signal missesIncremental is faster
How do you know a load worked?Counts and sums against the source for each closed partition, freshness, null rates. The job status isn’t evidenceIt finished without an error
A load dies halfway through. Now what?Rerun it, because the output is replaced by partition or written by key, so a second run lands the same dataRestart it and check the table
Where do rows that fail validation go?A quarantine table that records the reason and the source file, owned by somebody who reads itDrop them, or fail the whole load
Log-based or query-based change capture?The log sees every change in order, deletes included. A query only sees what its timestamp column admitsLog-based is real time

Not every seat needs every exercise below. This table says where to spend the hour, using the same seat names as the pay table in our salary guide. Pick two rows from it before you schedule anyone.

Seat you are fillingSpend the hour onKeep short
Stable estate maintenanceThe double rerun, the shifted columnThe deletes
Ingestion engineerThe late order, the deletes, the shifted columnThe repeated hour
Transformation or analytics engineerThe shifted column, the repeated hourThe late order
Orchestration and reliability engineerThe double rerun, the late orderThe shifted column
Migration leadThe deletes, the repeated hourThe double rerun

The Extract That Succeeds Every Night and Is Still Short

Incremental loads are how most estates keep up with a source that keeps growing. Read only what changed since last time. The whole question is who decides what changed, and when. Print the query and the five orders, and tell the candidate the job has run clean every night for a year.

-- nightly_extract.sql, scheduled 02:00
SELECT order_id, customer_id, amount, updated_at
FROM   orders
WHERE  updated_at > :last_run;

-- after a successful load, last_run = the job's start time
OrderAmountupdated_atCommittedDoes the extract ever load it?
7710$41001:12:0501:12:05Yes, at 02:00
7711$22501:44:3101:44:31Yes, at 02:00
7712$1,18001:58:1201:58:12Yes, at 02:00
7713$2,64001:59:4002:00:03No
7714$30502:00:4102:00:41Yes, the next night

Finance says the warehouse is $2,640 under the order system for this window, and every run was green. Find the order.

Order 7713. Its updated_at is 01:59:40, stamped when the transaction opened, and it committed at 02:00:03, three seconds after the job started reading. That night’s extract couldn’t see it. The next night’s extract asks for rows newer than 02:00:00, and 01:59:40 isn’t. So the order never loads. Nothing anywhere says so. PostgreSQL’s documentation describes now() and CURRENT_TIMESTAMP as returning the start time of the current transaction, which is exactly how a row ends up stamped earlier than the moment anyone could read it.

The warehouse holds $2,120 of the $4,760 on the page, which is 45 percent. A real table loses one order in a few thousand, and that is the reason it takes a quarter-end tie-out to notice. Rare. Costly.

A strong candidate gets there by asking when updated_at gets written. Then they fix it in the right place. Moving the watermark to the largest updated_at the job actually read is better than the job’s start time, but a long transaction can still slip under it, so the sturdier answer re-reads a window, say the last two hours, and lets a keyed upsert absorb the overlap. The sturdiest drops the timestamp and reads the database’s own change log. Then ask the question that matters. How would they find out it was happening? A nightly count and sum per closed day against the source, with zero tolerance on money, would have flagged this on the first morning. A candidate who stops at the overlap window has fixed one job, while one who adds the tie-out is going to catch the next.

The weak answer is a one-character edit. It changes > to >=. That repairs two rows sharing one timestamp and does nothing for 7713.

The 247 Customers Who Should Be Gone

Same family of problem, different failure. The printed page this time is a month-end reconciliation.

Reconciliation, October
billing.customers (source)      41,872 rows
dw.dim_customer (warehouse)     42,119 rows
Nightly load                    31 of 31 SUCCESS
Load method                     upsert where updated_at > last_run

The load was green all month and the warehouse is 247 rows heavy. Where did they come from?

From deletes. An upsert driven by a timestamp can only see rows that still exist, and a deleted row has no timestamp to compare, so it never arrives. 42,119 less 41,872 is 247 customers the source has forgotten and the warehouse remembers.

Ask how they would see a delete at all, and listen for the options. Log-based change capture reports it as an event. Debezium’s documentation says a database delete produces two Kafka records, one with “op”: “d” and the prior row, and a tombstone with the same key and a null value. Its event flattening transform drops the first by default because most consumers can’t handle it yet, and keeps the second, so whether a delete ever reaches the warehouse depends on how the sink treats a null. A candidate who knows that has configured it before. The other two routes work on any source. The system of record can soft delete with a flag the extract can read, or the pipeline can compare keys alone, target against source, every night. Cheap. It finds deletes no matter which system made them, and it needs no log access at all.

Then the judgment part, which is the better half. Deleting the 247 from the warehouse isn’t automatically the right move. Some were duplicates that deserve to vanish. Some were cancelled accounts whose orders still need a customer row to hang from, and those get a flag and stay. And some may have been erasure requests, in which case the warehouse copy, the extracts built from it, and anything downstream are the part nobody remembers, and privacy counsel needs to be in the conversation. A strong candidate asks why the rows were deleted before touching one. A weak one runs the DELETE. Done by lunch.

Two identical oak cubes side by side with an orange cord tied around only one, a picture of a pipeline job that ran twice

Rerunning Two Failed Nights

Scheduler retries are where idempotency gets tested for real. Here is the task, printed, and a short story to read aloud. The nights of October 14 and 15 failed during a source outage, and on the morning of the 16th somebody reran both from the scheduler.

-- daily_sales.sql, retried by the scheduler
INSERT INTO fact_daily_sales
SELECT CURRENT_DATE - 1, store_id, SUM(amount)
FROM   pos_transactions
WHERE  sale_ts >= CURRENT_DATE - 1
AND    sale_ts <  CURRENT_DATE
GROUP  BY store_id;
Business dayTrue salesIn the warehouse after both reruns
October 14$183,400$0, no rows
October 15$176,900$353,800, loaded twice
Two-day total$360,300$353,800

Both reruns finished successfully and the two-day total is within two percent. Is the data right?

No. Each rerun asks the clock what yesterday is, and on the 16th the clock says the 15th both times. One day is doubled, the other is missing, and the total lands $6,500 short of the truth, or 1.8 percent, which is inside the noise anyone expects from a retail week. Totals pass. Days fail. Remember that. It’s the lesson, and a candidate who says it unprompted has been burned before.

The Apache Airflow best-practices guide reads like a diagnosis of this one task. It says a task should produce the same outcome on every re-run, that INSERT during a re-run can duplicate rows and should give way to an upsert, that a task should read and write a specific partition with data_interval_start as the partition and never read the latest available data, and that the datetime now() function should never be used inside a task for the critical computation. Print that paragraph if you like. A candidate who has worked with any scheduler, not only Airflow, will say the same things in their own words.

The repair is small. The scheduler hands the job the business date as a parameter, and the job replaces that day’s rows in one transaction, delete then insert or a keyed merge, so running it three times leaves one day. Weak answers include deduplicating afterward with a window function, which cleans the 15th and still leaves the 14th empty, and “just don’t rerun it”, which sounds responsible until the outage lasts a week. And ask about the check. One count per business day. That would have caught it.

The File That Gained a Column

Vendors change files. They announce it sometimes. Sometimes. Print the contract header, Tuesday’s header, and the load statement, and give the candidate the table.

Contract, unchanged for two years
order_id,customer_id,order_date,amount,tax

Tuesday's file
order_id,customer_id,order_date,discount,amount,tax

COPY INTO orders (order_id, customer_id, order_date, amount, tax)
  FROM @vendor_stage
  FILE_FORMAT = (TYPE = CSV SKIP_HEADER = 1
                 ERROR_ON_COLUMN_COUNT_MISMATCH = FALSE);
OrderFile says: discount, amount, taxLands in amountLands in tax
500112.50, 480.00, 38.4012.50480.00
50020.00, 1,250.00, 100.000.001,250.00
500331.25, 75.00, 6.0031.2575.00
50040.00, 2,200.00, 176.000.002,200.00
TotalAmount 4,005.00, tax 320.4043.754,005.00

The log says four rows in, four rows expected, zero errors. Is anything wrong?

Nearly everything. The load maps by position, the new discount column sits where amount used to be, and every field slides one place to the right. Amount now holds the discount. Tax holds the amount. The real tax is the sixth field, and the load drops it. Snowflake’s COPY INTO documentation describes this behavior when the column-count error is switched off, loading matching fields in order of occurrence and skipping the rest. Every value is a valid number. Nothing fails. The tax report now shows $4,005.00 of tax on $43.75 of sales. A strong candidate laughs, a little, and then notices that the row count was the only thing the pipeline checked.

The fixes come in layers. Map by column name, which Snowflake offers as MATCH_BY_COLUMN_NAME, or the equivalent in whatever tool is in play. Check the header against the contract before a single row loads and quarantine a file that doesn’t match, with an alert to a human who knows the vendor. Sanity-test a ratio, since tax at roughly eight percent of amount is something the pipeline can verify. Then ask the question that separates experience from reading. Do you keep the untouched raw file? Without it, Tuesday can’t be reloaded, only guessed at. Someone who answers “of course, in a landing zone with the date in the path” has probably paid for this lesson once.

The Hour That Happened Twice

The calendar is the oldest source of trouble in this trade. Per NIST’s daylight saving time page, in 2026 the clocks went back at 2 a.m. on November 1, when local time became 1 a.m. again and that hour repeated, which makes it a day with an extra hour. Print the table definition and the two counts.

hourly_orders
  store_id        INT
  hour_local      TIMESTAMP        -- no time zone, Pacific local time
  orders          INT
  PRIMARY KEY (store_id, hour_local)

Sunday, November 1 (store 14)
  01:00 to 02:00 PDT, first pass     212 orders
  01:00 to 02:00 PST, second pass    198 orders
  Whole day, 25 hours                5,486 orders

What does the 1 a.m. row show, and how many hours did that Sunday have?

25. The table has room for 24. A plain GROUP BY on local time folds both passes into one bucket of 410, a spike that looks like a promotion. A keyed load does something worse. One pass overwrites the other, 212 or 198 orders disappear without a sound, and the day reads 5,274 or 5,288 instead of 5,486. The daily total from a different job still says 5,486, so now two dashboards disagree, and somebody spends a week blaming the one that was right.

The strong answer starts with storage. PostgreSQL’s documentation says timestamp with time zone values are stored internally as UTC and converted for display. Keep UTC in the table, carry the zone with the data, derive the local business date at the reporting edge, and key the hour on the UTC hour so November 1 simply has 25 rows. Schedule jobs in UTC too. Then ask about March, when 2 a.m. skips to 3 and a job scheduled for 2:30 local points at a time that doesn’t exist. What the scheduler does with it varies by tool, and “I’d test it on the second Sunday of March” is a respectable answer. The next one falls on March 14, 2027.

One more wrinkle for companies with stores in Phoenix and Los Angeles. NIST lists Arizona, outside the Navajo Nation, among the places that don’t observe daylight saving time, so the two cities share a clock for about 65 percent of the year, the share NIST gives for DST, and sit an hour apart for the rest. A candidate who knows that has dealt with a multi-state estate.

Two identical brass keys hanging from one hook with an orange cord loop, a picture of one clock hour that happens twice

What a Strong Answer Names, and What a Studied One Reaches For

Not everyone on your panel has been paged for a silent failure. Hand them this table. It lists what to listen for.

ExerciseSomeone who has been paged namesSomeone who has studied reaches for
The order that is never loadedWhen the timestamp is written, an overlap window, a keyed upsert, a nightly count and sumChanging > to >=
247 extra customersDeletes are invisible to a timestamp, key comparison, why they were deletedRunning a DELETE
Two reruns, one day doubledThe business date as a parameter, replace by partition, a per-day checkDeduplicating afterward
The shifted columnsMap by name, check the header first, keep the raw fileChecking the row count
The hour that happened twiceUTC storage, the zone carried with the data, 25 rows for the day, the March skipThe server’s time zone setting

Two Exercises, Printed, With the Data Owner in the Room

Choose two rows from the seat table and give each about twenty minutes. Don’t try for all five. An hour that reaches the fifth has spent no time on the follow-up, and the follow-up is where the answer lives.

Put somebody in the room who owns the numbers. The analyst who closes the month, or the finance lead whose report goes wrong first, will recognize a good answer from the opening sentence and ask the question you’d never think of. Count the questions a candidate asks before answering. Zero tells you how they will read their first ticket.

Candidates will use an AI assistant on the job, and nothing printed here is hard to generate. Every query above reads as correct. So ask what they would check in the output of one before it ships, and listen for the five habits from the table. Counts. Sums per day. A header. A zone. That’s it.

Questions Hiring Managers Ask Us Before the Loop

ETL or ELT, does the interview change?

The interview changes only in its first ten minutes, because all five failures in this post happen under ETL and ELT alike. A missed row, a missed delete, a double rerun, a shifted column, and a repeated hour don’t care where the transform runs. Ask each candidate where they would run it, and why.

Does the tool matter, Informatica or SSIS or Azure Data Factory?

A tool name matters less than the posting suggests, because these five failures live in the logic and not in the product, so the exercises transfer across Informatica, SSIS, and Azure Data Factory. One question on the tool you actually run is plenty. For product depth on one vendor, our Informatica set goes further than this page does.

How is this different from a data engineer interview?

A data engineer loop spends its time on Python, system design, and platform choices, while this one reads pipelines that already exist and asks what is wrong with them. Plenty of strong data engineers pass it. Some don’t. Our data engineer interview questions cover the building side.

Can we give these to a junior candidate?

Give a junior candidate two of them, the double rerun and the shifted column, because both yield to careful reading and a little experience. Skip the repeated hour and the deletes for anyone with under three years of pipeline work. A junior who asks what the job does when it’s run twice is worth a second interview.

What should the offer look like?

Base pay runs $115,000 to $150,000 for an ingestion engineer, $135,000 to $185,000 for orchestration and reliability, and $150,000 to $195,000 for a migration lead, per our hiring guide. Which job sits behind the title sets the band. The salary guide shows why published pay pages disagree, and the salary benchmark assistant prices a specific metro.

I’m the one being interviewed. How do I prepare?

Prepare by breaking a pipeline of your own, running it twice, deleting a source row, adding a column to its input, and pushing a day through the clock change. Write down what each did to the totals. Interviewers listen for what you check before you answer, so say your checks out loud.

Rerun Your Own Last Failed Job

If one idea from this page makes it into your next loop, make it this one. Pull the log from the last job that failed in your shop and the rerun that followed it. Ask someone who didn’t fix it what the second run did to the target table. Whatever they can’t answer in ten minutes is your interview. Ten is generous.

If you’d like help building the exercise, bring the failure log and the org chart to our ETL recruiters and we’ll build the exercise and the shortlist from them. Of the people we place, 92 percent are still with the client when the year is up, and our IT searches average 17 days from first call to accepted offer. Whether the seat should be a direct hire or a contractor for a dated migration is a question for the first call. For the roles beside this one, we also recruit data scientists and data engineers.